图5:在产品交付周期中,不同活动和角色在不同的时间达到峰值,因此,具体的参与者或是角色不需要在100%的时间里被100%的使用,这一点是可行的。
Figure 5: different activities and roles peak at different times in a product delivery cycle. Therefore, it's feasible that a specific actor or role isn't 100 percent utilized 100 percent of the time.
图11:在1.0版本的期望维护峰值周围确定2.0版本的迭代时间。
Figure 11: Define and schedule your iteration lengths for Version 2.0 around the expected maintenance spike for Version 1.0.
实验表明计算时间有所减少,峰值信噪比有所提高,且图象无明显块效应。
The experience shows that computing time is reduced; PSNR is raised and there is no clearly block effecting.
实验表明计算时间有所减少,峰值信噪比有所提高,且图象无明显块效应。
The experience shows that computing time is reduced; PSNR is raised and there is no clearly block effecting.
应用推荐