• 此次核电厂选型于2005年5签订合同,是目前岭澳2次扩建工程安装基础之上的。

    The model selected for this "Generation 2.5" nuclear power plant is based on the one currently being installed at Ling Ao 2 extension project, under a contract signed in May 2005.

    youdao

  • 摘要:CPR 1000技术方案基于大亚湾岭澳核电厂成熟设计,目前有10在建机组采用该技术方案。

    Abstract: CPR1000 technique is based on the mature design of Dayabay and LingAo Phase 1 NPP, and is being applied for over 10 in-building units.

    youdao

  • 摘要:CPR 1000技术方案基于大亚湾岭澳核电厂成熟设计,目前有10在建机组采用该技术方案。

    Abstract: CPR1000 technique is based on the mature design of Dayabay and LingAo Phase 1 NPP, and is being applied for over 10 in-building units.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定