此次核电厂的选型是于2005年5月签订的合同,是在目前岭澳2次扩建工程安装基础之上的。
The model selected for this "Generation 2.5" nuclear power plant is based on the one currently being installed at Ling Ao 2 extension project, under a contract signed in May 2005.
摘要:CPR 1000技术方案是基于大亚湾和岭澳一期核电厂的成熟设计,目前有10台在建机组采用该技术方案。
Abstract: CPR1000 technique is based on the mature design of Dayabay and LingAo Phase 1 NPP, and is being applied for over 10 in-building units.
摘要:CPR 1000技术方案是基于大亚湾和岭澳一期核电厂的成熟设计,目前有10台在建机组采用该技术方案。
Abstract: CPR1000 technique is based on the mature design of Dayabay and LingAo Phase 1 NPP, and is being applied for over 10 in-building units.
应用推荐