摘要双机共尾水调压室是水电站引水发电系统中一种常见的布置形式,存在尾水调压室水位波动和水力干扰问题。
The tailrace surge chamber shared by two units , common in hydropower stations with diversion systems , has problems of water level fluctuation and hydraulic disturbance.
研究表明:如果合理地选择设计连接管断面的尺寸和型式,就可以进一步减小有连接管的尾水调压室水位波动稳定所需的断面积。
According to this study, the optimal design in the size and shape of the linking pipe helps to reduce the sectional area for stability.
研究表明:如果合理地选择设计连接管断面的尺寸和型式,就可以进一步减小有连接管的尾水调压室水位波动稳定所需的断面积。
According to this study, the optimal design in the size and shape of the linking pipe helps to reduce the sectional area for stability.
应用推荐