• 层间隔器测试后,操作人员TORRENT充填的服务工具定位下层的位置上来对此层进行挤压充填作业。

    After the zonal isolation packers were simultaneously set and tested, the TORRENT service tool was positioned at the lowermost zone to perform the frac-pack stimulation.

    youdao

  • 一次下钻时,首先将封隔下入预定位置时,通过在位于隔器下方的短接下入堵头而后加压实现

    One-trip setting is accomplished by pressuring up against a plugging device below the packer after it has been run to depth.

    youdao

  • 一次下钻时,首先将封隔下入预定位置时,通过在位于隔器下方的短接下入堵头而后加压实现

    One-trip setting is accomplished by pressuring up against a plugging device below the packer after it has been run to depth.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定