• 应用有限元数值,对连拱隧道“三导洞施工围岩结构受力变形规律进行了分析。在两正洞拱部施工时候,左右洞拱顶沉降约占最终沉降的70%。

    The regularity of stress and strain of surrounding rock and support structure when using(3-heading) excavation method to construct double-arc tunnel is carried out by FEM numerical method.

    youdao

  • 应用有限元数值,对连拱隧道“三导洞施工围岩结构受力变形规律进行了分析。在两正洞拱部施工时候,左右洞拱顶沉降约占最终沉降的70%。

    The regularity of stress and strain of surrounding rock and support structure when using(3-heading) excavation method to construct double-arc tunnel is carried out by FEM numerical method.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定