在污染负荷预测基础上,根据三峡建库前后不同的边界条件,对其最大容许污染负荷量进行了初步分析计算。
Moreover, the permissible pollution load in Xiangxi River is initially analyzed and calculated with different boundary conditions of the Three Gorges Reservoir.
与容许拉力为100000牛顿/米,这一带是在许多重负荷的应用,包括汽车业,垫木在长距离运输的成功。
With an admissible tensile force of 100,000 N/m, this belt is successful in many heavy load applications, including the automotive industry, where skids are transported on long runs.
与容许拉力为100000牛顿/米,这一带是在许多重负荷的应用,包括汽车业,垫木在长距离运输的成功。
With an admissible tensile force of 100,000 N/m, this belt is successful in many heavy load applications, including the automotive industry, where skids are transported on long runs.
应用推荐