• 美国亚特兰大或者芝加哥市差不多距离大概需要花费18到19个小时特拉克,特拉克地区需要轨道分享给12000货运许多客运车

    New York to Atlanta or Chicago is a similar distance, and takes 18 to 19 hours on Amtrak, which must share tracks with 12, 000-ton freight trains and many commuter trains.

    youdao

  • 西部客运站吗?应该乘坐路公交车呢?

    Is it far to go to the West Bus Station? Which bus should I take?

    youdao

  • Amtrak车次的客运列车在这个线路运行着但是他们的官方不会多少影响。

    Amtrak has a passenger line that runs along the same tracks, but officials say it would be less affected by the project.

    youdao

  • 第四十九机动车载人不得超过核定人数客运机动车不得违反规定载货

    Article 49 a motor vehicle shall not carry persons by exceeding the ratified number, and a passenger transport motor vehicle shall not violate the provisions regarding the carriage of goods.

    youdao

  • 广州市客运站总站523路公交车,到桃源站下车,直400左右,右转再直120米左右到。

    Guangzhou city bus terminus sit 523 bus to Taoyuan station, go straight 400 meters, 120 meters to the right again.

    youdao

  • 事务委员会讨论监察车用燃油零售价格审批航空客运燃料附加费

    The Panel discussed on the monitoring of auto-fuel retail prices and approval of fuel surcharge on air passengers.

    youdao

  • 介绍上海客运专线车经营权,公平公开合理原则,实行向社会公开招标全过程

    The operation permit for franchised bus routes in Shanghai and the whole course of its public bidding under the principle of fair, public and rational competition are briefed.

    youdao

  • 目前产品电动飞机牵引车,电动行李牵引车电动旅客运送车。

    Products to be displayed The current product lines are Electric Aircraft Tow Tractor, Electric Baggage Tow Tractor and Electric Courtesy Shuttle.

    youdao

  • 司机︰客运太慢了。,只要一半时间能送台北

    Taxi Driver: the bus is so slow. Come in my car, and I'll get you to Taipei in half the time.

    youdao

  • 第四十九机动车载人不得超过核定的人数客运机动车不得违反规定载货

    Article 49 Passengers carried by a motor vehicle shall not exceed the verified number. Passenger motor vehicles shall not be used for carrying cargoes in violation of regulations.

    youdao

  • 分析了各种线路参数变化对车一线系统动力学响应影响规律,并由此得出部分高速客运专线设计参数的合理取值

    The law of influence exerted by various line parameters on vehicle-line system dynamic response is analyzed in order to obtain the reasonable value of design parameters of some high-speed railways.

    youdao

  • 窖口客运站总站公交车路线:23311个花圈站转乘76A路(坐10个站)到元下田站后乘38路到总站下车。

    Jiaokou passenger station Termini bus: take the 233 road (sat 11 station) to a small wreath station 76A road (sit 10 station) to the element to work in the station by 38 road to alight.

    youdao

  • 窖口客运站总站公交车路线:23311个花圈站转乘76A路(坐10个站)到元下田站后乘38路到总站下车。

    Jiaokou passenger station Termini bus: take the 233 road (sat 11 station) to a small wreath station 76A road (sit 10 station) to the element to work in the station by 38 road to alight.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定