• 每天工作10阴雨天气下:持续工作5,可根据实际情况

    Daily work: 10 hours, rainy weather conditions: for 5 days, decided in accordance with actual condition.

    youdao

  • 分析道路堵塞交通特性基础,基于改进停车启动模型,推导出道路堵塞车辆排队长度排队持续时计算模型,并用实际例子对该方法的有效性进行验证。

    Based on the analysis of the characteristics of traffic flow under crowded road, an improved models of parking wave and starting wave were used to calculate queuing length and queuing duration.

    youdao

  • 结果表明,随着间隙长度增加,接头承载能力趋于减小接头的实际剪切强度持续上升间隙长度继续增加,接头的实际强度趋于下降。

    Results from the experiment show that the load bearing ability of the single-lap joint decreases as the length of the gap increase but the actual shear strength is increased in same time.

    youdao

  • 个已被报告危险当做实际存在的危险,你必须工作过程告诉工人你没把这个被报告的危险当做一个真正的危险,并解释原因将确保工人们在危险识别过程中进行持续合作。

    When you do not view a reported hazard as an actual hazard, it is critical to the ongoing process to inform the worker that you do not view it as a true hazard and explain why.

    youdao

  • 发生病毒突变24实际产生持续生化学缓解比率减低15%,到29个月为0%。

    After virological breakthrough, the actuarial probability of maintaining biochemical remission diminished to 15% at 24 months and 0% at 29 months.

    youdao

  • 发生病毒突变24实际产生持续生化学缓解比率减低15%,到29个月为0%。

    After virological breakthrough, the actuarial probability of maintaining biochemical remission diminished to 15% at 24 months and 0% at 29 months.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定