• 正在施工龙羊峡水电站,1981年9月发生了有实测记录以来最大的一次洪水

    The Longyangxia hydropower project which in under construction encountered the heaviest flood on record in September, 1981.

    youdao

  • 本文根据原型振动实测位移记录,应用时间识别求得了结构的前态的固有频率阻尼比。

    Some modal natural frequencies and damping coefficients of a structure are derived by means of in-sita testing displacement records and the time domain identification technique.

    youdao

  • 介绍一种利用实测振动记录确定已有建筑物刚度中心方法

    Method to estimate the center of rigidity of buildings by using vibration recordings is presented in the paper.

    youdao

  • 结合一维应力波动理论,以实测打桩记录为依据采用反分析方法确定后继打桩出现拒锤现象时的单承载力。

    Based on the driving records, the back-figured method is applied to estimate the pile bearing capacity after refusal taking place.

    youdao

  • 好吧不要浪费时间记录线上员工实测值了,让他们测量多次这样合格数记录量都会增加。

    Well, let's not waste time making the line operators write down the measurements that they read; they take more measurements than what's required, so an OK or a tick is more than enough.

    youdao

  • 介绍利用实测振动记录确定已有建筑物刚度中心的方法。

    A Method to estimate the center of rigidity of buildings by using vibration recordings is presented in the paper.

    youdao

  • 介绍利用实测振动记录确定已有建筑物刚度中心的方法。

    A Method to estimate the center of rigidity of buildings by using vibration recordings is presented in the paper.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定