• 工程经理组织出国疑问把每一个工程划分成若干个阶段以便有效地停止管制控制,并实施工程组织的日常运作联系起来。

    Project managers or the organization can divide projects into phases to provide better management control with appropriate links to the ongoing operations of the performing organization.

    youdao

  • 完整有效控制工程造价,应对影响工程造价三个阶段实施全过程控制

    For whole and effective controlling engineering cost it is needful to implement all process control to three sections of influence engineering cost.

    youdao

  • 建设实施阶段,建设单位在招投标合同管理材料价格、施工管理(监理)、工程决算等几个方面,加强管理能够有效控制工程造价

    Project cost can be effectively controlled from the aspects of implementation, bidding, contract management, material and stuff price, construction supervision and project budget.

    youdao

  • 风险管理控制削减山岭隧道工程风险的有效手段,于工程建设阶段实施

    Risk management and control, which is effective to reduce risk of mountain tunnel engineering, can be implemented during the construction of mountain tunnel engineering.

    youdao

  • 风险管理控制削减山岭隧道工程风险的有效手段,于工程建设阶段实施

    Risk management and control, which is effective to reduce risk of mountain tunnel engineering, can be implemented during the construction of mountain tunnel engineering.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定