确认供应商质量控制计划及其实施,确保供应商使用准确的检验方法,推动供应商完成PPAP文件。
Supplier quality control plans verification, inspection method confirmation, and push the supplier to finish PPAP documents.
方法采用拓能系统的固定装置、计划系统、激光灯、弓形尺、头部模型(简称头模)模拟3DCRT的实施过程进行质量控制分组实验。
Methods To do quality control experiments to simulate the process of 3D-CRT by means of Topsland system, radiation treatment -planning system, laser light, bow form ruler, head model.
方法采用拓能系统的固定装置、计划系统、激光灯、弓形尺、头部模型(简称头模)模拟3DCRT的实施过程进行质量控制分组实验。
Methods To do quality control experiments to simulate the process of 3D-CRT by means of Topsland system, radiation treatment -planning system, laser light, bow form ruler, head model.
应用推荐