我国建设工程计价模式主要有定额计价模式和清单计价模式两种。
There are mainly two kinds of pricing models in construction project in china:the pricing mode of construction bill of quantities and fixed pricing model.
相对于传统的定额计价方法,工程量清单计价方法是一种新的计价模式。
The measurement valuation of project quantities bill of building works is a new method of valuation relatively to the traditional method of norm valuation.
提出,工程量清单计价模式下的工作重心相比定额计价模式有了很大的转变。
The traditional pricing model focuses on measuring according to the pictures and applying the corresponding quota.
工程量清单计价法从原理、内容及方法上与原有定额计价模式相比有很大差别。
In principle, content and method, the valuation method of engineering volume list (EVL) is quite different from the previous one which adopted quota valuation mode.
本文阐述了工程量清单计价的特点和重要性以及工程量清单计价与传统定额计价的区别。
It also point out the difference of counting on engineering quantity and the traditional counting on norm.
本文论述了实行工程量清单计价模式的重要性及其优越性;探讨了它与传统的定额计价模式的区别与联系。
The paper expounds the importance and superiority of the mode of evaluation with bill of quantity, and discusses the difference and relationship with traditional quota mode.
[摘要]针对定额计价和工程量清单计价并存的局面,采用图释的方法剖析两种计价模式在计价方法和招投标上的区别。
Abstract: According to the co-existence of quota pricing and bill of quantity pricing, analyzes the differences of the two pricing patterns in valuation method and bidding by picture explaining.
工程量清单计价是国际普遍采用的计价模式,和传统定额计价模式在计价依据、计价方法和指导思想等方面有着本质的差别。
Quantity bill is a kind of valuation mode used all over the world, it is constitutionally different with traditional quota valuation mode in valuation ground and method, guidance idea and so on.
工程量清单计价作为一种新的计价模式,正在逐步替代以往的定额计价模式,这种计价模式的变革势必会对建筑行业产生根本的影响。
As a new model of valuation, construction-volume inventory valuation is replacing the traditional quota valuation. This reform will inevitably produce fundamental influence on construction industry.
定额计价与工程量清单计价模式的概念,在应用时经常发生混淆,文章通过实例和实践总结,从多方面阐述了这两种计价模式的不同之处。
This paper defined the concepts of quota valuation and a valuation inventory with amount of works and explained the difference between them through extensive practice.
开展土地资源调查评价费用标准研究,制定全国统一定额模式、计价方法及相关的参数十分必要。
It is held critical to establish a unified national norm model, pricing technique and parameters for charges of land resources investigation and evaluation.
阐述工程设计阶段进行优化设计和造价控制的重要性,并对工程建设概预算定额及计价依据进行分析。
Importance of optimization design and cost control during the design stage of a project is put forward. Project budget rating and pricing basis are also analyzed.
摘要:建筑工程与修缮工程的消耗量定额不能完全适用于旧工业建筑改造工程计价。
Abstract: Consumption quota of architectural engineering and restoration project are not entirely suitable for the old industrial buildings renovation project valuation.
本文主要叙述传统定额模式计价与工程量清单模式计价的本质区别与联系。
This paper probes into the basic differences and relations of traditional quota pricing method and bill of qualities pricing method.
我国目前采用的工程造价模式是以定额为计价基础的全过程造价管理模式。
The project cost management model that we're applying now is Whole Process Cost Management model using the ration as the pricing basis.
结合某地计价定额对超高施工的规定和具体实例,从招标阶段和施工阶段分别阐述超高施工增加缺项问题的处理方法,供计价人员在工程计量计价实务中参考。
This paper combines somewhere valuation quota of ultrahigh construction and specific examples, expounds the processing method of short term from the bidding stage and construction stage.
作为我国工程造价管理重要手段和计价依据的定额也面临着重新定位的问题。
As important manage means and estimation reference, the quota also faced with the problem of positioning again. This paper discusses the change of position and role about quota in new situation.
作为我国工程造价管理重要手段和计价依据的定额也面临着重新定位的问题。
As important manage means and estimation reference, the quota also faced with the problem of positioning again. This paper discusses the change of position and role about quota in new situation.
应用推荐