在此宏观模型的基础上,利用简约梯度法推求各供水泵站优化的工况点。
Based on this macroscopic model, reduced gradient method was applied to search for the optimal working conditions of pumping stations.
在此宏观模型的基础上,利用简约梯度法推求各供水泵站优化的工况点。
Based on this macroscopic model, reduced gradient method was applied to search for the optimal working conditions of pumping stations.
应用推荐