得到如此多的帮助,她很高兴。(完成被动式)
管道和电缆架没有进行埋线,大部分的通风和制冷设施通过半被动式系统完成。
Pipes and cable trays are not hidden and most of ventilation and cooling is done through semi-passive systems.
于是NOEM用了十周完成这个现代感十足的被动式住宅。
NOEM designed and built this modern passive house for them, and in 10 weeks finished the project.
于是NOEM用了十周完成这个现代感十足的被动式住宅。
NOEM designed and built this modern passive house for them, and in 10 weeks finished the project.
应用推荐