• 需要记住重要的一点这些状态相关信息是达到最终目的一种方法最终是指完成能够产生利润回报软件产品的开发、测试发布

    It's important to remember that this status-related information is always a means to an end, where the end is the development, testing, and release of software products to generate revenue.

    youdao

  • 系统集成测试人员能够通过提取非功能集成测试相关信息完成测试用例的程序库

    Systems integration testers are able to complete the test case library by extracting information related to non-functional integration test cases.

    youdao

  • 只要这个故事相关的代码工作分支完成实现通过测试我们所有相关内容工作分支上复制主干上就可以了。

    As soon as a story is implemented and tested on the work branch we copy everything from work to trunk.

    youdao

  • 他们不是自己完成所有事情而是那些事实上负责系统设计、模块责任人相关测试人员一起合作

    They are not supposed to do everything themselves but rather work with and through the persons who are in fact responsible, system engineers, module responsible persons, involved testers and so on.

    youdao

  • 确保及时完成原料中间体成品稳定性产品测试,及时完成分析方法验证相关实验。

    Make sure the testing for raw material, in-process and final product, stability study, etc., validating for analytical method finished in time.

    youdao

  • 最后系统完成情况以及相关测试报告进行了总结。

    At last, the completion of the system and the related test-report are summarized.

    youdao

  • 按照进度完成代码测试相关文档

    Ensure the development code, test and documents are delivered as scheduled.

    youdao

  • 整个设计完成相关硬件电路设计连接和软件代码编写调试,最后实现了整个系统的集成和测试

    The whole design is fulfilled with the linking of the hardware circuits, the composing and debugging of software code, at the very end accomplish the integration and testing of the whole system.

    youdao

  • 现有实验条件下完成相关实验测试

    Carried out the correlation experiment test under the current experimental conditions.

    youdao

  • 第二部分设计FPGA芯片EPF10 K 10lc84 - 3为核心系统硬件电路进行了相关测试完成了预定的功能

    In the second part, the circuit board of the system based in FPGA chip EPF10K10LC84-3 has been designed and tested, finally has implemented appointed function.

    youdao

  • 对于数模混合芯片测试验证很大一部分工作还是依赖昂贵仪器完成使用大量集成电路工程师来进行相关模拟芯片的可测性设计,这样既增加了成本和难度。

    A large part of the test and validation for digital-analog hybrid chips is to rely on expensive equipment to carry out or design for test through a large number of IC engineers associated to analog.

    youdao

  • 产品开发产前阶段进行产品EPFEP测试完成测试报告跟进相关产品缺陷纠正保证只有合格的产品才能进行大规模生产

    Conduct ep or FEP test for new product on pre-production or development stage, prepare the test report and follow defect's correction, insure only pass product can be released to mass production.

    youdao

  • 波音最大昂贵新版747-8已经完成其三分之一的功能可靠性测试。而787的相关测试尚未开始

    The 747-8, the newest version of Boeing "s biggest and most expensive plane, has completed more than a third of its function and reliability testing, a segment the 787 has yet to start."

    youdao

  • 波音最大昂贵新版747-8已经完成其三分之一的功能可靠性测试。而787的相关测试尚未开始

    The 747-8, the newest version of Boeing "s biggest and most expensive plane, has completed more than a third of its function and reliability testing, a segment the 787 has yet to start."

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定