• 通过完井测试获得裸眼段测以及水泥测试资料。

    Open hole logs and a cement-bond log were obtained to build a completion-adviser log.

    youdao

  • 1测试期间2测试封隔器均被埋死造成非常严重事故

    During the completion well testing period of the vertical well section of Ku 1, we tested 2 times and the downhole packer was all imbedded, result in very serious downhole accident.

    youdao

  • 1测试期间2测试封隔器均被埋死造成非常严重事故

    During the completion well testing period of the vertical well section of Ku 1, we tested 2 times and the downhole packer was all imbedded, result in very serious downhole accident.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定