目前,大朝山水电站建设正在优质高效地进行。
At present, the Dachaoshan Hydropower Station is under construction in high quality and effectiveness.
从整体上看,大朝山水电站的工程地质条件是比较好的。
In general, the engineering geological conditions of Dachaoshan Hydropower Station is comparatively good.
对原大朝山水电站安全监测系统人工观测数据库中的不足进行了更新改造。
The manual observation database of the dam safety monitoring system of the Dachaoshan Hydropower Station is improved.
大朝山水电站由于加强了设计管理,进行设计优化,取得了较大的经济效益。
Because of the enhancement of the design and management and the optimization of the design, the Dachaoshan Hydropower Station has gained a comparatively good economic benefit.
云南的大朝山水电站,是长约4800公里的湄公河上面的许许多多大坝之一。
The Dachaoshan dam in Yunnan province, China is one of many dams on the approximately 3,000-mile (4,800-kilometer) Mekong River.
云南的大朝山水电站,是长约4800公里的湄公河上面的许许多多大坝之一。
The Dachaoshan dam in Yunnan province, China is one of many dams on the approximately 3,000-mile (4,800-kilometer) Mekong River.
应用推荐