• 提出设备电气大修计划成本控制计划,在生产过程中实施有效控制;

    Draw up the equipment electrical maintenance plan and cost control plan, and take effective control during production.

    youdao

  • 汽轮机组实施计划检修耗时费用高,大修往往发现汽轮机本体辅助设备健康状况良好

    Scheduled overhaul on a steam turbine costs long time and much money, and the turbine body and auxiliary equipment are often found in good conditions when the cylinder is opened.

    youdao

  • 汽轮机组实施计划检修耗时费用高,大修往往发现汽轮机本体辅助设备健康状况良好

    Scheduled overhaul on a steam turbine costs long time and much money, and the turbine body and auxiliary equipment are often found in good conditions when the cylinder is opened.

    youdao