该项目主要材料是大而扁平的外墙砖和细长的预应力混凝土(颜色米黄色),通过一个宽敞的内部中庭空间与外部空间有机结合在了一起。
The dominant materiality of the project, large format brick and slender pre-stressed concrete elements (beige in color), binds the outside Spaces with that of the large internal atrium space.
岩锚初始预应力、自由段长度、外部荷载量值控制着锚索及锚碇在锚碇系统中参与的荷载贡献值和作用时机。
Initial prestress, length of free-segment of anchor cable and the load value determine contribution value and action occasion of the anchor cable and tunnel anchorage.
整个结构采用预应力混凝土结构,外部包钢壳。
The construction is prestressed concrete and is coated with steel shell.
整个结构采用预应力混凝土结构,外部包钢壳。
The construction is prestressed concrete and is coated with steel shell.
应用推荐