车间里的生产会议会解决一些严重而复杂的难题。
Production meetings at job shops cover some seriously complex problems.
待拆静止炉炉底位于车间内,其周围环境复杂。
The static furnace bottoms to be demolished are in a workshop and have a complicated surrounding environment.
车间调度问题是一个复杂的NP问题,车间调度系统需要具有相当的柔性机制。
Job shop scheduling is a complex NP problem, scheduling system need considerable flexibility mechanism.
车间调度问题的突出特点是其复杂性。
The dramatic characteristic of the job shop scheduling problem is its complexity.
由于承受载荷的复杂性,加上年久失修,其中铜浮车间内侧挡墙出现明显的破坏。
The inner side wall of one workshop became significantly fractured owing to complexity of loads and using of long time without repair.
由于承受载荷的复杂性,加上年久失修,其中铜浮车间内侧挡墙出现明显的破坏。
The inner side wall of one workshop became significantly fractured owing to complexity of loads and using of long time without repair.
应用推荐