该流程包括外业全站仪测绘展点,内业用复合线连点,测量面积、绘制地籍表格、线编辑、点编辑、区编辑和保存工程文件等工作环节,并就工作中应注意的相关问题作了说明。
The process include showing the point measured by Total Station, linking the point in interior job, measuring the area, drawing the excel, editing the line , point, area and saving the project file.
该流程包括外业全站仪测绘展点,内业用复合线连点,测量面积、绘制地籍表格、线编辑、点编辑、区编辑和保存工程文件等工作环节,并就工作中应注意的相关问题作了说明。
The process include showing the point measured by Total Station, linking the point in interior job, measuring the area, drawing the excel, editing the line , point, area and saving the project file.
应用推荐