• 减压阀备用阀门打开减少压力

    The PORV 'backup valve is opened to lower the pressure.

    youdao

  • 7小时30分钟尽管操作员已将入主回路,但温度仍然很高减压阀备用阀门打开减少压力

    7 hr 30 min Even after operators pump water into the primary loop, pressure is still high. The PORV 'backup valve is opened to lower the pressure.

    youdao

  • 8分钟一个操作员注意回路备用水泵阀门的,于是打开阀门。二次回路现在运作正常

    8 min An operator notices that the valves for the backup pumps in the secondary loop are off. He opens the valves. The secondary side now operating normally.

    youdao

  • 海水淡化设备用软管一个容量为45升海水箱相连斯伯茨划船时打开脚部阀门就可给水箱补充。海水淡化设备每小时可以生产20多的淡水。

    A hose connects the tankwhich can be replenished by opening a valve in the footwell — to a desalination machine that can produce 6 gallons of fresh water an hour.

    youdao

  • 阀门预备维修应该订购备用更换套管

    A spare replacement sleeve should be placed on order when this valve is placed in service.

    youdao

  • 阀门预备维修应该订购备用更换套管

    A spare replacement sleeve should be placed on order when this valve is placed in service.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定