• 注意避免风机负荷不平衡呈现喘振查看备用冷却风机启动

    Pay attention to avoid the two Typhoon aircraft due to load imbalance and present surge, see the alternative cooling fan since the start.

    youdao

  • 备用冷却波音公司制造,重780刚好安装空间站气前部一个工作面上,相对接近故障泵模组。

    The spare 780-pound coolant pump, built by Boeing, is mounted on an external platform just in front of the station’s airlock module, relatively close to the faulty pump module.

    youdao

  • 备用冷却波音公司制造,重 780刚好安装空间站前部一个工作面上,相对接近故障泵模组。

    The spare 780-pound coolant pump, built by Boeing, is mounted on an external platform just in front of the station's airlock module, relatively close to the faulty pump module.

    youdao

  • 但是海啸冲毁冷却系统使用备用发电机

    But the tsunami washed out the backup power generators being used in the cooling operation.

    youdao

  • 包括冷却系统水泵在内的备用组件舱里,安装工作普遍认为是艰难的,必须进行两次太空行走。

    Spare components are on board, including two coolant system pumps, but installation is considered difficult and two spacewalks will be required.

    youdao

  • 核电站失去驱动冷却水泵主要电力来源海啸损毁紧急情况下驱动水泵备用柴油发电机

    The nuclear plant lost its main source of electric power to drive the pumps, and the tsunami knocked out the backup diesel generators that were supposed to drive the pumps in an emergency.

    youdao

  • 首先冷却系统,然后有一个备用系统,备用系统还有一个备用系统,再有一个备用系统的备用系统,如此下去。

    There's the main cooling system, a backup to it, a backup to the backup, a backup to the backup to the backup, and so on.

    youdao

  • 虽然电动冷却失去了外供电但是备用柴油发电机开始运作,超冷却继续循环使堆芯降温

    The electric cooling pumps had lost power from the grid, but back-up diesel generators kicked into action, and ultra-pure cooling water continued to circulate through the cores.

    youdao

  • LHC可以启动必须其5万超流体液氦冷却绝对零度之上1.8 K的温度,这是迄今为止历史最大低温工程

    Before the LHC can start, 50,000 tonnes of equipment have to be cooled to just 1.8? Kelvin above absolute zero with superfluid liquid helium - by far the largest cryogenic project in history.

    youdao

  • EPR依靠主动式水泵抽运冷却反应堆Areva发言人昨天TechnologyReview记者称,设计额外的备用发电机组满足多余的需求。

    While the EPR relies on active pumping to maintain reactor cooling, an Areva spokesman told Technology Review yesterday that it has extra backup generators for added redundancy.

    youdao

  • 有官员表示他们希望于能够尽快恢复电站的动力供应,以便能够冷却系统备用发电机

    Officials also said they were hoping that they would restore "as soon as possible" the power supply to the plant, which is needed for the cooling system and back-up generators.

    youdao

  • 所有原料煮沸冷却备用

    Cook all ingredients and cool down.

    youdao

  • 地震发生时核电站已经自动中止裂变反应过程一般剩下冷却系统——发电机备用发电机——处于运行状态

    At the onset of the earthquake, the plant automatically shut down the fission process, which normally would leave the coolant system — both the main one and a backup generatorstill operational.

    youdao

  • 正常运行是个备用设备发生失水事故时,可注入应急冷却,以确保核电站安全

    During normal operation, it is a stand-by facility. When a loss-of-coolant accident occurs, it injects emergency cooling water into the core to ensure the safety of the nuclear power plant.

    youdao

  • 内胎自动生产:内胎机压出,经过冷却、裁断、打孔粉、收取全自动整套生产线。

    Use: After the rolling. The inner tube of a tyre will go through the complete auto production line. Such as cooling, blowing dry, cutting out, boring coving nozzle and spraying dust etc.

    youdao

  • 内胎自动生产:内胎机压出,经过冷却、裁断、打孔粉、收取全自动整套生产线。

    Use: After the rolling. The inner tube of a tyre will go through the complete auto production line. Such as cooling, blowing dry, cutting out, boring coving nozzle and spraying dust etc.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定