• 宽阔长廊日后中环岸线大特色,填海土地约有9公顷作休憩用地。

    The future shoreline of Central will be marked by a spacious waterfront promenade. Indeed, some 9 hectares of reclaimed land are zoned for open use.

    youdao

  • 坐落填海土地上的Songdo或许迄今雄心勃勃的智能城市项目预计花费350亿美元,并容纳6.5万

    Sitting on reclaimed land, Songdo is perhaps the most ambitious smart-city project so far. It is expected to cost $35 billion and will be home to 65,000 people.

    youdao

  • 尽管是有记录以来最严重地震,但大多数主要建筑物仍完整挺立(除了土地的建筑物外),说明这些建筑达到很高技术标准

    Most major buildings stood up very well (except those on reclaimed land) in spite of the record quake, attesting to the high technical standards of those buildings.

    youdao

  • 荷兰人上帝赐予的湖泊干了建造土地,他们的填海工程造就世界最大人工岛

    While draining their God-given lakes and seas to make land, the Dutch also happened to create the world's largest artificial island.

    youdao

  • 荷兰主要土地开垦而来

    A substantial part of the Netherlands has been reclaimed from the sea.

    youdao

  • 这块土地开垦出来

    This land was reclaimed from the sea.

    youdao

  • 这个低地国家已经开拓出许多平方英里土地

    Many square miles of land in this low-lying country have been reclaimed from the sea.

    youdao

  • 马来西亚填海工程有限单元法模拟了软式透水管真空排水固结法处理软土地基的过程

    As an example, procedure of soft-clay foundation reinforcement by means of the vacuum drainage technique for a sea-filling engineering in Malaysia is simulated.

    youdao

  • 西九龙填海工程计划提供340公顷土地,用以兴建运输要道、商业楼宇房屋

    The West Kowloon Reclamation (WKR) provides a total of 340 hectares of land for strategic transport links, commercial development and housing development.

    youdao

  • 第三十二条填海项目竣工形成土地,属于国家所有。

    Article 32 the land brought into existence after completion of a sea-filling project shall be owned by the State.

    youdao

  • 工程连同中环湾仔填海计划其他各期工程,会提供土地沿港岛北岸(中环与港岛东部之间兴建重要连接

    Together with the other phases of Central and Wan Chai Reclamation, it will accommodate strategic road links along the north shore of Hong Kong Island between Central and the eastern part.

    youdao

  • 最后一工程13公顷土地期工程余下道路工程均正在施工。

    Infrastructure works have been substantially completed, and the final phase of reclamation to provide 13 hectares of land and remaining roadworks are in progress.

    youdao

  • 填海连接九龙新机场新界西北部重要道路铁路干线,提供土地

    The west Kowloon Reclamation will provide housing for more than 100 000 people, commercial space and vital road and rail arteries linking Kowloon with the new airport and north-west new Territories.

    youdao

  • 填海连接九龙新机场新界西北部重要道路铁路干线,提供土地

    The west Kowloon Reclamation will provide housing for more than 100 000 people, commercial space and vital road and rail arteries linking Kowloon with the new airport and north-west new Territories.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定