基于实际情况的需要,研究碾压混凝土坝基础长间歇垫层的温度应力影响因素,对于温控防裂具有重要实用价值。
Based on the actual needs of the situation to study the thermal stress factor for a foundation during long intermittence of roller compacted concrete dam is the great scientific value.
在碾压混凝土坝施工过程中,有时因为灌浆和导流的需要,基岩上浇筑完基础垫层后长时间停歇,即形成基础垫层长间歇。
In RCC dam construction project, sometimes because of the need for grouting and river diversion, the thin concrete block during long intermittence would be caused after a long idle time.
所有钢筋混凝土构件均采用HPB235和HRB335钢筋,基础采用C25混凝土,垫层采用100毫米后c 15素混凝土。
All are made of reinforced concrete structures reinforced HPB235 and HRB335 foundation will use C25 concrete with 100 mm of C15 cushion plain concrete.
所有钢筋混凝土构件均采用HPB235和HRB335钢筋,基础采用C25混凝土,垫层采用100毫米后c 15素混凝土。
All are made of reinforced concrete structures reinforced HPB235 and HRB335 foundation will use C25 concrete with 100 mm of C15 cushion plain concrete.
应用推荐