• 先行固定塔吊立于轨道上后固定位置处于回填土上时,基础特殊处理必须满足承载要求

    To walk after fixed tower crane should remain on track, such as fixed position in backfill soil, the foundation for special treatment, must meet the load requirements.

    youdao

  • 同时降低桥头地基的荷载基础应力减少沉降增加填料密实度,台背回填采用液态粉煤灰填筑。

    At the same time, liquid coal ash is used in backfilling of abutment, so as to reduce the load and basic stress, reduce settlement and increase the dense of fillings.

    youdao

  • 隧道出口回填厚度较大基础土体软弱,因此采用了桩-筏基础的形式以避免过大沉降带来的不利影响

    Considering the thick backfill and soft foundation soil in the cut-and-cover section of Jiadi tunnel, a pile-raft foundation is accepted in order to avoid negative effect due to excessive settlement.

    youdao

  • 明确基础最终清理范围回填范围。

    Please clearly indicate the final clearance area and backfilling area for the foundation.

    youdao

  • 明确基础最终清理范围回填范围。

    Please clearly indicate the final clearance area and backfilling area for the foundation.