• 城市道路地下管线交叉冲突制约整个城市管线工程建设重要因素

    The underground pipeline cross interference of city road is an important factor which constrains the whole urban pipeline engineering construction.

    youdao

  • 同行更好执行新《城市地下管线探测技术规程》有关工程监理要求,提供了有益参考

    It offered an useful reference for the relative project supervision in order to conduct the new "Technical Regulations of City Underground Pipeline Location" in better way.

    youdao

  • 目前直径泥水平衡顶掘进已成为城市给排水水管电力管线工程首选施工方法

    At present the large diameter slurry pipe jacking is the preferred construction method in project of urban water supply and drainage pipe and electric power pipe.

    youdao

  • 报道上海城市燃气工程中,浦东新港首站北蔡末天然气供气管线的通球扫线、全线整体试压以及氮气置换施工实例

    It reports a practical engineering of natural gas supply pipeline from Pudong New Port to Beicai Station in Shanghai metropolitan fuel gas project.

    youdao

  • 随着地下工程不断增加,国内外对城市隧道施工引起邻近地下管线损害研究日益重视

    With the increase of underground construction, great attention is being attracted to the research on underground utilities hazard brought by tunneling in urban area.

    youdao

  • 本文通过工程实例,探讨了进行城市地下排水管线探查质量控制需要注意的问题以供参考

    This paper gives us a helpful solution by examples of the problems during quality control of inspection in city underground drainage pipeline.

    youdao

  • 富阳市大桥路工程实践介绍城市沿河道路管线复杂状态处理道路滑坡方法,提出了以抗滑桩处理路基病害工程措施,达到了良好的治理效果。

    Taking Great Bridge road Project practice in Fuyang City as an example, the paper introduces the method for treating road landslide under the condition of complex lining in urban roads along river.

    youdao

  • 非开挖工程中,水平定向钻进技术广泛应用于城市地下管线铺设工程

    Horizontal Directional Drilling technology is widely used in urban underground pipe laying engineering.

    youdao

  • 城市道路公路规划红线进行管线工程建设的,管线位置的规划安排应当遵循下列规定

    When the construction of pipe-and-line-works is carried out within the planned red line of urban roads and highways, the position arrangement of pipe-and-line-works shall follow the provisions below.

    youdao

  • 城市道路公路规划红线进行管线工程建设的,管线位置的规划安排应当遵循下列规定

    When the construction of pipe-and-line-works is carried out within the planned red line of urban roads and highways, the position arrangement of pipe-and-line-works shall follow the provisions below.