• 系统处理过程中将重复坐标连接活动指令

    The system will then repeat the coordinates and joint action commands during the process.

    youdao

  • 安装产品用三坐标进行重复性、再现性研究,重复性再现性R&R符合QS9000/MSA测量系统分析(均值极差)第三版标准

    The checking fixture must be measured on CMM after installing IP ASM. part. The R&R% should conform to the standard of QS9000/MSA v3.0(the average and range method).

    youdao

  • 安装产品用三坐标进行重复性、再现性研究,重复性再现性R&R符合QS9000/MSA测量系统分析(均值极差)第三版标准

    The checking fixture must be measured on CMM after installing IP ASM. part. The R&R% should conform to the standard of QS9000/MSA v3.0(the average and range method).

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定