断层上断点埋深是隐伏活动断层地震危险性评价中的一个重要参数。
Buried depth of fault up-breakpoint is a important parameter in earthquake risk estimate of buried active fault.
地震活动断层分段在核电工程选址及其地震危险性评价中具有重要的意义。
The segmentation of seismo-active fault has become one of the basic methods in the nuclear power plant siting and the seismic risk analysis.
“十五”期间即将实施20个省会级城市的活断层探测与地震危险性评价工程。
The exploration and seismic risk assessment of active faults in 20 capital cities of China will be carried out during the period of the 10 th "Five-Year Plan".
如何合理地评价其地震危险性,一直是大家关心的问题。
It has been riveting people's attention how to evaluate the seismic risk in the area.
对工程场地的地震危险性分析是地震安全性评价的主要方法,并且为工程师提供抗震参数。
Engineering seismic hazard analysis for a specified site represents an essential element of seismic safety assessment, and provides engineers with the standards of protection against earthquakes.
根据这些定量参数,评价活动构造地震的危险性,同时,还简要地讨论了大陆内部现代构造活动的动力学问题。
These quantitative parameters can be applied to assess the seismic risk of active tectonics. The geodynamics for recent tectonic movement in the interior of the continent is also discussed in brief.
本文通过对地震地质背景分析和数学有限元计算,最后提出对焦作-鹤壁矿区地震危险性工程地质评价。
This paper puts forward the engineering geological evaluation of seismic risk of Jiaozuo-Hebi mine areas by the analysis of seismic geological background and finite clement calculation.
本文通过对地震地质背景分析和数学有限元计算,最后提出对焦作-鹤壁矿区地震危险性工程地质评价。
This paper puts forward the engineering geological evaluation of seismic risk of Jiaozuo-Hebi mine areas by the analysis of seismic geological background and finite clement calculation.
应用推荐