• 三峡库区地质灾害防治工程顺利实施

    The third phase of the project to prevent and control geological disasters in the Three Gorges Reservoir area was carried out smoothly.

    youdao

  • 本文明确指出地质灾害防治工程一项地质工程不是土木工程

    The article clearly Pose: the geological engineering of prevention and control is a sort of geological engineering. not a civil engineering.

    youdao

  • 由于地质灾害防治工程没有定额计量规则,致使其造价管理存在许多问题

    Many problems in cost management are caused by the fact that there are no quotas and measurement rules on geological disaster prevention project.

    youdao

  • 本文概述了黄腊石滑坡地质灾害防治工程可行性研究工作中的监测系统数据处理

    The monitoring and data processing systems in the investigation on the feasibility of the controlling Engineering for the geological harzardHuanglashi Landslide are summarized in this paper.

    youdao

  • 根据地质灾害防治工程减灾经济效益评估需要将其划分通用直接经济效益间接经济效益。

    Upon the request of assessing the disaster mitigation effect in geologic disaster prevention and control project, direct and indirect economic efficacies have been taken as two general indicators.

    youdao

  • 材料破坏演化过程地质灾害防治工程亟待解决关键科学问题,也是力学前沿课题。

    The failure progress of geological material is a key scientific problem in the engineering of geological hazard and control, and is also a frontal problem in mechanics.

    youdao

  • 三峡库区地质灾害防治工程涉及到库岸工程44处之多,预测整治设计重要依据

    In Three Gorges area, the No. 3 geologic hazard prevention involves 44 engineerings about reservoir bank. And the bank slump prediction is the very important basis of reservoir bank regulation design.

    youdao

  • 三峡工程水库库分布数量众多地质灾害点,国家投入巨额资金进行地质灾害防治

    Numerous geologic disaster points are distributed along the reservoir bank of Three Gorges reservoir and the government has invested giant fund to prevent and harness geologic disasters.

    youdao

  • 文章以河南某地石灰岩矿山着重介绍矿山分项工程地质灾害危险性预测评估基本思路分析方法防治对策

    Taking a limestone mine in Henan Province as an example, this paper mainly introduces basic consideration devaluation ways of thinking, analysis methods and preventional countermeasures.

    youdao

  • 人为控制性杭州地铁工程施工防治浅层气地质灾害必要措施

    The artificial control of pre-exhausting shallow gas is a necessary measure for preventing geological disasters before the construction of Hangzhou Metro.

    youdao

  • 人为控制性杭州地铁工程施工防治浅层气地质灾害必要措施

    The artificial control of pre-exhausting shallow gas is a necessary measure for preventing geological disasters before the construction of Hangzhou Metro.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定