• 露天采矿工程中的高边坡稳定性受到很多因素的干扰控制,其中包括地形条件气象水文条件地层岩性条件,地质构造条件

    In open pit mining project the stability of high slope is affected and controlled by many factors, such as topography, meteorology, hydrology, stratum lithology and geological structure conditions.

    youdao

  • 矿山中的自然地质实体采矿工程实体,都空间实体,并且所有的矿山生产组织活动均是三维地质环境中进行的。

    All of the entities of natural geological and mining engineering are three-dimensional spatial entities. And mine producing and activities are in the true three-dimensional geological environment.

    youdao

  • 矿山中的自然地质实体采矿工程实体,都空间实体,并且所有的矿山生产组织活动均是三维地质环境中进行的。

    All of the entities of natural geological and mining engineering are three-dimensional spatial entities. And mine producing and activities are in the true three-dimensional geological environment.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定