• 通过经纬测绘1:50 0地形过程各个工序分析,得出了1:50 0地形上的点位中误差

    Through the analysis on every procedure of surveying 1:500 topographic map with the method of transit mapping, the position error of 1:500 topographic map is got.

    youdao

  • 全站地形测绘方法全站测图的工作过程主要数据采集、数据处理、图形编辑图形输出。

    Total station topographic mapping method Total station mapping of the work process are: data collection, data processing, graphics editing and graphics output.

    youdao

  • 对比方法着重分析了提高精度原因,并DM 502红外测距反射安置方法作了较详细的叙述。文章后谈到了DM 502红外测距测绘地形的优点。

    Through comparison it is mainly discussed why the accuracy of mapping can be improved using DM502 as well as how to set the reflector related to DM502.

    youdao

  • 多波束测深高精度高效率地形测绘设备适合大面积的海测量作业,是21世纪水下地形测量必不可少测绘仪器。

    Multi-Beam Echo Sounder is an absolutely necessary seafloor mapping device with high accuracy and high efficient at 21st century. It is much fitted to sweep mapping for wide area.

    youdao

  • 多波束测深高精度高效率地形测绘设备适合大面积的海测量作业,是21世纪水下地形测量必不可少测绘仪器。

    Multi-Beam Echo Sounder is an absolutely necessary seafloor mapping device with high accuracy and high efficient at 21st century. It is much fitted to sweep mapping for wide area.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定