• 地下采用桩基础和地下连续墙

    The basement is supported by pile-raft.

    youdao

  • 根据特点,选择人工地下连续逆作法施工

    Artificial borehole diaphragm wall and reverse construction method are adopted according to the characteristics.

    youdao

  • 鸿吉商贸中心超高层建筑基坑支护采用地下连续

    The underground continuous wall has been adopted in the foundation pit support of the super high building of Hongji Commercial and Trade Center.

    youdao

  • 地下连续地铁基坑围护结构广泛使用。

    Underground diaphragm wall had been great used in enclosure structure of subway and deep foundation.

    youdao

  • 本文论述地下连续泥浆挖掘稳定性问题。

    The stability of sludge sump of underground continuous wall during short sump excavation was discussed.

    youdao

  • 推导了由裂缝控制限值地下连续弯矩的计算方法。

    An equation to calculate concrete diaphragm walls bending moment is deduced based on the crack control limit value.

    youdao

  • 本文地下连续施工两个应注意问题进行了讨论

    This article discusses two noticeable problems in the construction of underground continuous wall.

    youdao

  • 本文地下连续施工两个应注意问题进行了讨论

    This article discusses the two noticeable problems in the construction of under ground continuous wall.

    youdao

  • 计算公式用于基坑护坡地下连续支护系统设计

    The formula can be used for pit supporting system design such as retaining pile, diaphragm wall and et al.

    youdao

  • 地下连续深浅幅设置,工艺复杂设计要求高,施工难度大

    The underground continuous wall was designed at inconsistent depth; this design program is very complex and led to very difficult construction.

    youdao

  • 模拟结果表明圆形地下连续效应有效地减少体的移;

    Results reveal that lateral movement of diaphragm is evidently reduced by arching effect;

    youdao

  • 现浇式地下连续垂直接缝二种主要形式钢筋钢板型。

    Reinforcement type and steel plate type are the two principal forms of the vertical shearing joints of the underground diaphragm Wells by casting in place.

    youdao

  • 研究基础的水平承载特性,对地下连续进行了水平荷载试验。

    To study the lateral bearing behavior, one single diaphragm wall is tested under lateral load.

    youdao

  • 地下连续工程现场观测基础,对其受力状态进行了分析探讨。

    Based on the field observation in construction of diaphragm retaining wall, the stressing state is analyzed.

    youdao

  • 发明涉及地下连续尤其是涉及种成槽机液压抓斗

    The invention relates to an underground continuous wall grooving machine, in particular to a hydraulic crab bucket of the grooving machine.

    youdao

  • 采用地下连续围护结构通过内衬横向框架施工方法实现。

    Continuous concrete wall is used in the air shaft structure, which is built with inversed construction method by using inner liner and transverse frame.

    youdao

  • 用于桩基检测推广应用于地下连续纵向接缝刚性强度测试

    The method of dynamical measurement which was applied to analysis of pile driving is extended to test and measurement on the stiffness and strength of vertical joints between diaphragm walls.

    youdao

  • 目前地下连续耐久性设计主要参考地面结构进行,而且很多时候被忽略

    Currently, the durability design of diaphragm wall is mainly based on that of the superstructure, and sometimes even omitted.

    youdao

  • 地下连续刚度大,变形小,作为基坑开挖阶段围护结构可有效的保护周边环境

    Diaphragm walls are commonly used as retaining structures in many deep foundation pits, especially when the environment protection is severe.

    youdao

  • 为此研究地下连续支护结构施工方法保证基坑开挖安全有重要指导意义

    Therefore, the research of construction methods of dam diaphragm wall has important guiding significance to ensure the safety of deep excavation.

    youdao

  • 本文通过对穿黄工程地下连续墙施工技术进行研究今后类似工程提供指导借鉴

    Hereby, study of construction technology for underground diaphragm in this cross Yellow river project is summarised as guideline and reference for similar projects henceforth.

    youdao

  • 地下连续墙接头采用预制钢筋接头连接端头辅以深层搅拌加固地基

    The tie in segment of the diaphragm wall is connected using pre reinforced concrete pile. The foundation strata of two shield well is also reinforced by deep mixing piles in order to seal water.

    youdao

  • 液压双轮作为一种新型机械设备地下连续工程施工中得到日益广泛应用

    As a new machine, hydraulic double wheel trench cutter is widely used in the construction of the underground continuous wall.

    youdao

  • 地下连续接点柔性改为刚性口管连接头箱施工工艺也起了相应的变化

    The change from flexible connector into stiff connector in the construction of continuous underground-wall brings about the changes of locking pipe, hollow jointer and construction technology.

    youdao

  • 基坑支护结构外部钢筋混凝土地下连续内部设多道钢筋混凝土水平框架支撑

    The retaining and protection structure for this deep excavation was concrete diaphragm wall supported by plane concrete frame inside.

    youdao

  • 地下连续墙开挖技术早已基础工程中有着广泛的应用,稳定问题一直没有很好地解决

    The slurry trench excavation technique has been widely used in Foundation Engineering for a long time, but the trench stability always is not being resolved well.

    youdao

  • 地下连续接头形式进行了总结探讨;对接头渗漏原因进行分析,介绍接头防渗堵漏技术

    In this article, the author concludes and discusses joint forms of underground continuous walls, analyzes reasons of joint leakage, and states several joint impervious and leakage-block techniques.

    youdao

  • 本文主要对地下连续大型矩形雨水泵房结构应用有关设计施工问题进行探讨、研究。

    In this paper, the question of design and construction of diaphragm wall used in large rectangular storm pumping station is discussed and studied.

    youdao

  • 地下连续水利工程基坑支护应用较多、挡结构施工基坑支护成功与否的关键。

    The diaphragm wall is a stopping soil and water structure which hydraulic excavation retaining uses more. Its construction is the key to the success of deep foundation pit.

    youdao

  • 地下连续水利工程基坑支护应用较多、挡结构施工基坑支护成功与否的关键。

    The diaphragm wall is a stopping soil and water structure which hydraulic excavation retaining uses more. Its construction is the key to the success of deep foundation pit.

    youdao