他将项目的风电机组数量减少到了130座,还要求在建设中遵循海洋地质学调查来避免惊扰敏感的土地。
He has ordered that the project be scaled back to 130 turbines, and is requiring that the developer conduct further Marine archaeological surveys to avoid disturbing any sensitive ground.
他将项目的风电机组数量减少到了130座,还要求在建设中遵循海洋地质学调查来避免惊扰敏感的土地。
He has ordered that the project be scaled back to 130 turbines, and is requiring that the developer conduct further Marine archaeological surveys to avoid disturbing any sensitive ground.