完成了基础埋石、首级四等测量、一级平面导线测量、等外水准测量、图根控制等野外数据采集以及数据编辑工作。
The completion of the foundation buried stone heads, four measurements, a flat wire measurement, substandard level of measurement, map the root control field data collection and data editing.
简述全站仪的构成及测设图根控制点的基本原理,分析布设图根控制点的测量精度并得出结论。
The form of electronic total station and the basic principle of determining and setting up root control points were related briefly. The accuracy of setting up root control points was analysed.
简述全站仪的构成及测设图根控制点的基本原理,分析布设图根控制点的测量精度并得出结论。
The form of electronic total station and the basic principle of determining and setting up root control points were related briefly. The accuracy of setting up root control points was analysed.
应用推荐