• 完成基础、首级四等测量、一级平面导线测量等外水准测量控制等野外数据采集以及数据编辑工作。

    The completion of the foundation buried stone heads, four measurements, a flat wire measurement, substandard level of measurement, map the root control field data collection and data editing.

    youdao

  • 简述全站构成控制基本原理,分析布设图根控制点的测量精度得出结论。

    The form of electronic total station and the basic principle of determining and setting up root control points were related briefly. The accuracy of setting up root control points was analysed.

    youdao

  • 简述全站构成控制基本原理,分析布设图根控制点的测量精度得出结论。

    The form of electronic total station and the basic principle of determining and setting up root control points were related briefly. The accuracy of setting up root control points was analysed.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定