系统安装、施工应符合相应的IEC国际标准或中国国家标准规范。所有的动力电缆、控制电缆和信号电缆布线要分开。
The system shall be installed and constructed in compliance with relevant IEC or China national standards or specifications. Power, control, and signal cables shall be wired separately.
电动机基本技术要求符合IEC34 - 1和GB755国际和国家标准要求,安装尺寸符合IEC72国际标准。
The basic technical requirements conform to the international IEC34-1 standard and national GB755 standard, and the mounting dimensions conform to the international IEC72 standard.
我们的IS O阀坚持具体安装足迹设立由国际标准化组织iso。
Our ISO valves adhere to the specific mounting footprint established by the International Standards Organization (ISO).
测量机的安装包括了机器的安装、调试以及测量机安装现场的最终验收。最终的验收将根据ISO 10360测量机国际标准执行。
System installation includes start-up, adjust and metrology test. The metrology test will be performed according the ISO 10360 standard regulation.
安装使用方便。所有的电接口均符合国际标准,安装时免调试,适用于不同的工作环境。
All the electrical interfaces are in line with international standards, installation, commissioning free, suitable for different working environment.
测量机的安装包括了机器的安装、调试以及测量机安装现场的最终验收。最终的验收将根据ISO 10360测量机性能评定的国际标准执行。
System installation includes setting up, adjust and metrology test. The metrology performance assessment will be performed according to the ISO 10360 standard regulation.
测量机的安装包括了机器的安装、调试以及测量机安装现场的最终验收。最终的验收将根据ISO 10360测量机性能评定的国际标准执行。
System installation includes setting up, adjust and metrology test. The metrology performance assessment will be performed according to the ISO 10360 standard regulation.
应用推荐