理顺围垦工程内部的管理机制等措施。
Rationalize the administration mechanism enclosing inside of project for cultivation waiting for measure.
而从1934年到漩门二期围垦工程后,纳潮量减小了22.57%。
In fact, after this reclamation project, the tidal influx has reduced 22.57 % since 1934.
疏浚机周围悬浮物的含量以及围垦工程溢流的排放可提供关于溢出率的信息。
The content of suspended matter around the dredger and the dis "-charge of the overflow from reclamation give information about the spill rate."
基于比奥固结理论,结合某沿海围垦工程,建立了三维弹塑性有限元模型,模拟了土体固结过程。
Based on Biot consolidation theory, combined with a certain project, a three-dimensional elastic -plastic FEM model is established, the process of soil consolidation is simulated.
通过本课题的研究,可为今后围垦工程建设的风险管理提供有益的借鉴,特别是对准备进入这个行业的保险公司具有参考意义。
Through this study, it is hoped to be useful for the reclamation project construction and supplies some reference for the insurance agent.
拥有丰富的复杂地层条件下项目设计和施工的岩土工程经验,例如围垦、软土、多块石的基层、岩石构造等。
He has extensive geotechnical experience both in the design and construction for projects in challenging ground conditions i. e. reclamation, soft ground, bouldary bed, rock formation etc.
沿海滩涂围垦地基土处理对沿海地区开发建设的意义非常重大,而该类地区土的欠固结性及承载力低是工程建设中比较突出的问题。
Foundation soil treatment method of coastal beach reclamation is very important for development and construction of coastal area, which has problems of low consolidation and bearing capacity.
开辟盐田和围垦造陆工程等人类活动,对海岸演变的影响显著。
Thus, human activities such as opening up salt fields and reclaiming tidal flats have impacted the coastal evolution processes remarkably.
围垦新区地势平坦,平均海拔4米,地层以沙质粉土为主,土层稳定,最适合工程建设。
The newly enclosed area is very flat, 4 meters above sea level. The soil is mainly sandy and powdery and very suitable for engineering construction.
围垦新区地势平坦,平均海拔4米,地层以沙质粉土为主,土层稳定,最适合工程建设。
The newly enclosed area is very flat, 4 meters above sea level. The soil is mainly sandy and powdery and very suitable for engineering construction.
应用推荐