• 钢筋骨架衬砌注砼初期砼支护,采用水泥湿式

    The re bar net preliminary lining mould shotcrete and preliminary and anchor shotcrete are used for support by the use of the semi wet spraying method with sand entrapped in cement.

    youdao

  • 隧洞围岩条件良好洞段,论证取消隧洞圆形钢筋混凝土衬砌选定马蹄形断面作为最终优化断面形式。

    For tunnel sections with good surrounding rocks, the U-shaped rock-bolted section is selected as a final optimized section instead of the original circular reinforcement concrete lining section.

    youdao

  • 隧洞围岩条件良好洞段,论证取消隧洞圆形钢筋混凝土衬砌选定马蹄形断面作为最终优化断面形式。

    For tunnel sections with good surrounding rocks, the U-shaped rock-bolted section is selected as a final optimized section instead of the original circular reinforcement concrete lining section.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定