掘进过程中的支护采用湿喷混凝土,3米厚的基底和穹拱衬砌采用浇注混凝土。
Wet sprayed concrete for supporting purposes during the drive, in situ concrete for the up to 3 m thick Base and for lining the vault.
对隧洞围岩条件良好洞段,论证取消隧洞原圆形钢筋混凝土衬砌,选定马蹄形锚喷断面作为最终优化断面形式。
For tunnel sections with good surrounding rocks, the U-shaped rock-bolted section is selected as a final optimized section instead of the original circular reinforcement concrete lining section.
对隧洞围岩条件良好洞段,论证取消隧洞原圆形钢筋混凝土衬砌,选定马蹄形锚喷断面作为最终优化断面形式。
For tunnel sections with good surrounding rocks, the U-shaped rock-bolted section is selected as a final optimized section instead of the original circular reinforcement concrete lining section.