某一种动物通常可以在很多天内极其精确地保持其特有的周期时间。
A particular animal typically maintains its own characteristic cycle duration with great precision for many days.
您可以记录关于这次活动的信息,例如,谁做的工作(参与者)、周期时间、已知问题、以及其他相关信息。
You can document information about this activity, such as who does the work (participant), cycle time, known problems, and other relevant information.
可在管理代理或部署管理器上配置轮询周期时间。
The polling cycle time is configurable at the administrative agent or the deployment manager.
首先,有时候消息只有一部分包含敏感信息,所以如果加密整个消息的话就会浪费周期时间。
Firstly, sometimes only part of a message contains sensitive information, and so you are wasting cycles if you encrypt the whole message.
如果一个集合用的时间太长以至于无法完成一个步骤(周期时间),那么显然会成为一个问题。
If an assembly takes too long to progress through a step (cycle time), then there is clearly a problem.
复制收集器的收集周期时间是由活跃对象的数量决定的。
The duration of collection cycles in a copying collector is driven by the number of live objects.
管理人员需要能够分析库存程度、周期时间、等待时间、产量、设备和人员利用率,以及流程各个方面所涉及的许多其他因素。
Management needs to be able to analyze inventory levels, cycle time, wait time, throughput, equipment and personnel utilization, and many other factors at all points in the process.
这项技术为所有交叉口计算一个单一的周期时间并将这个周期时间分割成每一个交叉口的绿灯时间,而后调整相位差,以便将等待时间减至最少。
It computes a single cycle time for all intersections, splits this cycle time into green times for each intersection and then adjusts offset times in order to minimise waiting times.
在其周期时间表内,中间一栏为以月计的衰退历时。
In the table of cycle dating, the center column is the length of contractions in months.
请注意,江恩拒绝接受这两个圈或100美元的价格转换周期时间的角度。
Note that Gann rejects the two circles or cycles of $100 price to convert the time angle.
机器有一些新的特点,减少了周期时间,为更多的产出。
The machine has some new features which reduces the cycle time for more output.
比如,通过SaaS提供的工具可以为决策者提供原料处理时间、生产周期时间和设备更换时间的理想指标。
For example, tools provided through SaaS could equip decision makers with knowledge on what metric goals should be achieved for material handling time, cycle time, and changeover time.
因此,评价物流的管理业绩和效果的准则,多半是以处理订单周期时间的速度,供货率及完成质量来量度。
Therefore, the appraisal flows the management achievement and the effect criterion, is mostly by processes the order form period the speed, supplying goods rate and completes the quality to measure.
在混凝土完全硬化之前拆模可以缩短周期时间。
Short cycle times can be achieved by detaching the mold plates before the concrete is completely set up.
我们模拟随机的周期时间,得到平均值以及变异数。
We simulate the stochastic cycle time and get its mean and variance.
电子交付这一方法缩短了单据转送和呈递的周期时间。
This approach reduces the cycle time for the forwarding and presentation of documents.
在传统生产方式中,物流环节占用了大量的周期时间和成本。
In traditional production mode, material handling phase takes large number of cycle time and costs.
分离器产品的吸力和交货时间的结果在较短的周期时间。
Disassociation of the actuator product suction and delivery times results in a shorter cycle time.
产品质量由产品加工的过程来保证,而过程偏差、周期时间和产出的持续改进对于降低产品成本、增加收入具有十分重要的意义。
Products quality is guaranteed only through production processes, and sustainable improvement of processes deviation, cycle time and output are significant to cost reduction and revenue improvement.
气动切刀装置确保了极短的工序周期时间和极高的效率。
The pneumatic cutting system guarantees shortest cycle times and ultimate efficiency.
流程的平均周期时间为何?
分析采用优化操纵策略对功能敏捷性的三种评估尺度(战斗周期时间、动态速率转弯图和相对能量状态)的影响。
Three functional agility metrics such as combat cycle time, dynamic speed turn plots and relative energy state are analyzed.
有利于减少成型周期时间,提高生产效率。
D, helps to reduce molding cycle time, improve production efficiency.
当该工具处于开启状态时,会形成一个较大的流通面积,可以最大限度地提高流量,减少周期时间,提高生产。
When the tool is in the open position during descent, a large flow area is exposed and maximizes flow through the tool to decrease cycle time and increase well production.
在摩托罗拉公司,RT技术缩短了原型模具周期时间,也降低了生产适用于实验模型汇编测试和机械试验的功能性原型零件的成本。
At Motorola, rt techniques reduce prototype tooling cycle time and cost required for production of functional prototype parts suitable for mock-up assembly tests and mechanical testing.
因此,评价物流的管理业绩和效果的准则,所以大多是以处理订单周期时间的速度,供货率及完成质量来衡量。
Therefore, the appraisal flows the management achievement and the effect criterion, is mostly by processes the order form period the speed, supplying goods rate and completes the quality to measure.
优化模块是以最小化周期时间或以基于服从工件质量约束校正模型后的周期时间为目标来确定磨削和修整参数。
Optimization is used to identify grinding and dressing parameters to minimize or target cycle time based on the calibrated models subject to workpiece quality constraints.
本发明提供一种成形模具及其控制方法,力图利用简单廉价的结 构缩短模具的成形模型的加热、冷却周期时间。
The invention provides a molding module and control method thereof to shorten the heating and cooling period time for the molding module by a simple and cheap structure.
几个可增加塑化时间而不增加周期时间的方法都离不开并行动作。
The few methods to increase plasticizing time without lengthening cycle time all depend on simultaneous action.
几个可增加塑化时间而不增加周期时间的方法都离不开并行动作。
The few methods to increase plasticizing time without lengthening cycle time all depend on simultaneous action.
应用推荐