• 现在9站台火车10:48出发,将在开往南京所有站停靠

    The train now standing at Platform 9 is the 10:48 train, calling at all stations to Nanjing.

    youdao

  • 现在站台火车10:48分出发的火车,它会在通往南京所有站点作停留。

    The train, now standing at platform 9, is the 10:48 train calling at all stations to Nanjing.

    youdao

  • 而在2006年,因南京地铁线施工,又有200棵梧桐移除。

    Nearly 200 more were removed to build Nanjing Subway Line Two in 2006.

    youdao

  • 恒隆广场”位于上海市静安区南京西路1266,坐落市中心繁华商业街上

    "Plaza66" is located at Nanjing West Rd 1266, jing 'an District, the most bustling commercial street in downtown area of Shanghai.

    youdao

  • 欢迎乘坐南京地铁S1线,本次列车开往禄口国际机场全程耗时35分钟

    Welcome to Nanjing Metro Line S1. This train is heading to Lukou International Airport Station. The whole trip takes about 35 minutes.

    youdao

  • 南京南站到了,请不要依靠车门从列车前进方向右侧车门下车。此可换乘地铁3线机场线。

    We are now at Nanjing South Railway Station. Doors will open on the right. Transfer is available for Metro Line 3 and Airport Express.

    youdao

  • 前方到站南京南站,请不要依靠车门从列车前进方向右侧车门下车。此站可换乘地铁3线机场线。

    The next station is Nanjing South Railway station. Doors will open on the right. Transfer is available for Metro Line 3 and Airport Express.

    youdao

  • 结合南京地铁1线建设介绍地铁车站乘客信息系统一种设计方案

    With the construction of Nanjing metro Line 1 as the background, this paper introduces a design option for the Passenger Information System (PIS) in metro stations.

    youdao

  • 南京地铁线新街口拟采用便桥疏解交通便桥结构采用“321”装配式公路

    Xinjiekou station of Nanjing No. 2 metro will solve the problem of traffic by the temporary bridge, whose framework is a "321" assembled steel highway bridge.

    youdao

  • 研究方法:结合西安南京铁路桃花铺1隧道工程实践,研究预防TBM施工事故措施施工方法。

    Research methods:This paper researched the preventive measures and construction methods on TBM construction accidents in terms of Taohuapu No. 1 tunnel construction practice of Xi'an-Nanjing Railway.

    youdao

  • 市中心南京东路888房屋一幢,前为丽华床上用品公司。

    No. 888 East Nanjing Road. Downtown Street Formerly occupied by Li Hua Bedclothes Co.

    youdao

  • 位于南京后面茂名路上小区安静舒适出名小区,离南京西路2线也就6.7分钟时间即可。

    Located in Maoming Road behind Nanjing Road. Quiet and soft. It's a famous community, only 6 or 7 minutes can arrive Nanjing West Road Subway Line 2.

    youdao

  • 南京地铁2线期工程TA11标包括逸仙桥—大行宫站—新街口站,采用施工

    TA11 bid for first stage of Nanjing Metro Line 2 is constructed with shield method, including Yixianqiao, Daxinggong and Xinjiekou stations.

    youdao

  • 南京东路站下车本报记者地铁2线转乘10线。

    In the nanjing road station after get off, our reporter from metro line 2 transfer line 10.

    youdao

  • 锦江向阳大厦为利仕达首家商务中心,坐落交通便利南京西路,在地铁2线南京西路口,静安商务中心核心地带。

    Lister's pioneer prestigious business center, conveniently located on West Nanjing Road near metro line 2 in the heart of Shanghai's Jing'an CBD.

    youdao

  • 南京78

    She lives at 78 Nanjing Road.

    youdao

  • 1993年在南京汤山葫芦发现2具人类头骨化石——南京1头骨南京2头骨。

    Two crania, Nanjing 1 and Nanjing 2, were found in a cave near Nanjing in 1993, and referred to as Homo erectus.

    youdao

  • 南京2人类头骨化石仅保留部分的额骨顶骨、枕骨颞骨,为一不完整的颅盖

    The Nanjing 2 calvarium is believed to represent Homo sapiens erectus since its discovery in 1993. This calvarium preserves incomplete frontal, parietal, and occipital bones.

    youdao

  • 文章详细介绍南京地铁线车辆系统线之间区别

    This paper introduces the difference of Nanjing Metro vehicle system between the line 2 and the line 1.

    youdao

  • 结合南京地铁1线轨道电位异常问题,提出了轨道电位异常分析研究一般方法,以及针对不同原因导致轨道电位升高的处理方法。

    In light of the rail potential anomalies happend in Nanjing metro Line 1, this paper provides a general analytic method, discuses the different reasons for the elevated rail potential.

    youdao

  • 为了给即将修建南京地铁3线10线开路,大约有1 100砍掉,其中有200棵法国梧桐

    Approximately 1,100 trees, of which 200 are plane trees of the French variety, are expected to make way for the Nanjing subway system's new Line 3 and Line 10.

    youdao

  • 交通便利步行南京西路地铁2线仅需7分钟,步行至新闸地铁1线也只需5分钟!

    Convenient transportation: only 7 minutes walk to Nanjing West Road Subway line 2 and 5 minutes walk to Xinjia Road Subway line 1!

    youdao

  • 文章主要南京地铁线线系统进行对比

    This article mainly compares the signal systems between line 1 and line 2 in Nanjing metro.

    youdao

  • 请接我方北京办事处南京路78,电话841- 6438。

    Beijing office at No. 78, nankeen road tel: 841-6438.

    youdao

  • 江苏省南京鼓楼区铁路北街128南京财经大学福建校区253…

    Airportinnanjing's railway north street 128, nanjing university of finance fujian road campus 253 mailbox …

    youdao

  • 门的心办公室迁至南京140

    We have move to our new office located at No. 140 nankeen road.

    youdao

  • 交通便利步行南京西路地铁2线仅需7分钟,步行至新闸地铁1线也只需5分钟!

    The transportation is convenient: walk to Nanjing West Road Subway Line 2 just take 7 minutes and to Xinjia Road Subway Line 1 just take 5 minutes!

    youdao

  • 地铁线,南京东路4口,左转马路对面

    Metro No. 2, East Nanjing Road Station, Exit4, turn left, opposite the road.

    youdao

  • 地铁线,南京东路4口,左转马路对面

    Metro No. 2, East Nanjing Road Station, Exit4, turn left, opposite the road.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定