本文将以上两种现代排序模型结合起来,讨论了加工时间可控的分批排序问题。
In this paper, we combine above two kinds of the modern sorts, discuss the batch scheduling with controllable processing times problem.
本文将以上两种现代排序模型结合起来,讨论了加工时间可控的分批排序问题。
In this paper, we combine above two kinds of the modern sorts, discuss the batch scheduling with controllable processing times problem.
应用推荐