荷试验包括应力控制和变形控制两种方法。
Unloading confining pressure tests could be controlled by stress and deformation.
然后利用该方程,进行了梁的静变形控制的研究。
Based on these equations, some problems about the shape control have been discussed.
该系统还在实际焊接构件的变形控制中得到应用。
This system is also used to reduce welding deformation of real structures by optimizing processing.
最后结合工程实例介绍了变形控制设计理论的应用。
At last, the application of deformation control design has been shown by a practical project.
介绍了对T型钢承轨偏轨箱形主梁的焊接变形控制。
Controlling for distortion of main box girder carrier-track welded with T-beam is introduced in the paper.
本文综述了第二届国际淬火和变形控制会议的论文。
In this paper, the proceedings of 2nd international conference on quenching and the control of distortion were reviewed.
壁板的变形控制是大型油罐质量控制的重点和难点。
Deformation control of the wall is of great importance and difficulty for quality control of large-volume oil tank.
对于大型钢结构平台的施工,防变形控制是施工的关键。
It is critical to control deformation during large size steel structure platform assembling.
目前,对压电结构的研究主要集中在振动控制和变形控制。
Now the researches of piezoelectric structure are mainly vibration control and deformation control.
如何实现高效、直观的变形控制则是人们一直关注的焦点。
How to achieve efficient and intuitive deformation control is the important topic in space deformation research.
采用以变形控制确定水泥搅拌桩桩长是优化设计的新方法。
A new optimum design method of cement mixing pile length is to control the...
对面板堆石坝而言,坝体变形控制是设计和施工的首要问题。
For the concrete faced rockfill dam, the deformation control is the key to the design and construction.
由变形控制所确定的内支撑挡墙与支撑自身的刚度优化公式;
Two optimizing formulas of the stiffness aimed for the wall and the strut system for deformation control;
十字形断面柱的结构特殊,对制作工艺及焊接变形控制要求较高。
It requires high level for manufacturing technology and welding deformation control because the structure of cross-section is special.
但变形过大时,会导致安全问题,设计和施工中应考虑变形控制。
However, oversize deformation would induce safely problem, so deformation control should be considered during design and construction.
对周边建筑物保护等级较高、基坑变形控制较严的工程尤为适宜。
It is especially suitable for projects of high-grade protected surrounding buildings and strict deformation-control foundation pit.
在拥挤的城市里,基坑开挖设计已逐步由强度控制转向变形控制。
The design of excavation controlled by strength has switched to the one controlled by deformation step by step in crowded cities.
高填方的沉降变形控制已成为高填方设计中面临的最重要课题之一。
Settlement deformation control about high fill becomes one of the most important problems for design.
实际上,深基坑变形控制目标不仅包括支护体系,而且包括相邻环境。
In fact, the deformation control goal of deep excavation not only includes retaining system, but also includes the adjoin environment.
该研究可为孔庄矿深部巷道非对称变形控制对策提供初步的理论依据。
This research provides a preliminary theoretical basis for the controlling countermeasures of asymmetric deformation characteristics of surrounding rock in Kongzhuang Mine.
主要介绍施工变形控制网和观测点的建立与观测方法以及数据处理与分析。
This paper introduces not only the development of monitoring control network and determination of observation points, but also data processing and deformation analysis.
研究成果对同类地层暗挖重叠隧道施工地层变形控制具有借鉴和参考价值。
The research result can provide reference to controlling the stratum deformation induced by overlapping tunnels construction in the similar stratum.
在复合地基设计中,按变形控制设计理论比按承载力控制设计理论更合理。
During the design of the composite foundation, the design theory of controlling deformation is more reasonable than that of controlling bearing capacity.
以变形控制为原则的桩基础设计是现代桩土相互作用理论的主要成果之一。
Design methods of pile foundation based on the principle of settlement control are a main achievement of the modern theory of interaction between pile and soil.
深基坑变形控制设计中,要考虑影响基坑变形的因素非常多,各因素又很复杂。
In deformation control design of deep foundation pit, many complicated factors influencing foundation pit deformation need to be considered.
阐述了目前机床结构热变形控制的主要对策:热优化、热温控、热补偿研究现状。
In this paper, main methods about thermal deformation control of present machine tools are presented, they are thermal optimization, thermal monitoring and thermal compensation.
本文是针对塑压模的热处理变形控制的研究。特别是对亚共析钢制塑压模更为有效。
This paper mainly researches on the control of heat treatment deformation of plasticpressing mould, the method is especially effective to the mould made of hyposteel.
计算结果表明,调整施工参数后,基坑变形发展趋势趋于稳定,达到变形控制的目的。
The result show that after the adjustment construction parameter deformation of the support in deep foundation pit tends to stably, achieves the deformation control the goal.
本文基于该基坑工程开挖施工的监测信息数据,进行变形预测、变形控制和有限元计算。
Based on the monitor information of deep excavation, prediction of deformation, deformation control measures and the finite element computation are carried on.
基坑工程的设计应该从强度控制设计向变形控制设计的转变,才能满足日益严格的环境要求。
It is pointed out that the design of foundation engineering should be transformed from strength control to deformation control to meet the requirements by environment protection.
应用推荐