研究了变压器绕组预紧力与变压器箱壁振动之间的关系。
The relation between transformer windings under different axial precompression and the vibration of transformer walls is studied.
变压器在拆箱后,在投入运行前的大楼施工期间,要用塑料薄膜外裹保护,防潮和防止灰尘甚至金属屑的可能进入。
Wrap the transformer after unpacking with plastic film for protection from moisture and possible entry of metal fillings during the building construction before the transformer is to be used.
熟悉主要部件如变压器,电机,变流器,齿轮箱,牵引系统及列车控制系统等。
Prefer those with knowledge about the main components such as transformer, converter, gear box, motor, traction system, train control system etc.
介绍了自行开发研制的电力变压器控制箱,有助于进一步了解变压器配套控制箱的工作原理、性能、作用及可靠性。
This paper introduced the transformer control cabinet designed by the authors, in order to let others well know the theory of operation, performance, manufacturing process, reliability.
订货时请提供下列资料:>箱变变压器类型和容量;
When ordering, please provide the following information:> Box and change the type of transformer capacity;
文章最后借助MATLAB电力工具箱进行了变压器空载合闸和合闸于故障的仿真试验,通过对不同情况的仿真,对原理进行了验证。
In this paper, some simulations of transformer are done when no-load closing under different conditions by using MATLAB. Results of the simulations also proved the priority of this principle.
我们极好的装备了几百种图案不同的绕组,端盖等多种选择,包括齿轮箱,制动器,旋转变压器,编码器和电位器。
We're tooled for hundreds of designs with different windings, end caps and other options including gearheads, brakes, resolvers, encoders and potentiometers.
它安装在变压器的油箱箱盖或侧壁上,当油箱内压力超过规定值时,对变压器起保护作用。
The pressure relief valve can be mounted on an oil tank cover or a lateral wall of the transformer for protection in case of pressure of the oil tank in excess of the rated valve.
场地分控箱供电禁止直接从泵站相线上搭接,如果需要从泵房供电,必须安装隔离变压器和隔离线路,因为场地分控箱处于雷电的威胁下。
The power supply of sub-control box is forbid to link directly from pump phase line, if needs to supplied from pump house, the isolate transformer and isolate line should be build up.
场地分控箱供电禁止直接从泵站相线上搭接,如果需要从泵房供电,必须安装隔离变压器和隔离线路,因为场地分控箱处于雷电的威胁下。
The power supply of sub-control box is forbid to link directly from pump phase line, if needs to supplied from pump house, the isolate transformer and isolate line should be build up.
应用推荐