附图为当前施工阶段平面布置图,现场布置有变动时会加以更新。
The drawings illustrate the plan layout used in the current construction stage. The site layout will be updated with changes.
用这种驱动无论是在停电后还是作现场应急调试和维修都不影响机床进给位置的确定,而且与机床机械原点的变动无关。
No matter what power cut or scene emergency debug and maintain will not affect the position of machine, which is independent of the alteration of machine origin.
如有变动,以现场工作人员的指示为准。
If there are any changes, please follow field staffs' instructions.
备注:以上活动安排仅供参考。如有变动,请见活动现场或网站。
Remark: the schedule is for your reference only, and subject changes will be publicized on the official website or on the spot billboard.
通过工程实例分析,论述了反射波法低应变动载检测的原理和在桩基础工程现场检测中的应用。
According to the analysis of engineering example, the paper discussed the principle of reflected wave method and its application for detecting quality of low strain pile foundation.
现场载荷试验及反射波法低应变动力检测试验表明,CFG桩桩身完整性很好,复合地基的承载力提高显著,证明该工程的CFG桩复合地基设计及施工是成功的。
The results of plate loading test and low strain dynamic testing show that the quality of CFG pile composite foundation is good and subgrade bearing capacity has been improved successfully.
注:演讲的顺序、标题、及与会专家如有变动,以现场安排为准。
Notes: the speech orders, topics and speakers are confirmed according to the actual arrangement.
注:演讲的顺序、标题、及与会专家如有变动,以现场安排为准。
Notes: the speech orders, topics and speakers are confirmed according to the actual arrangement.
应用推荐