应用该方法可进一步简化发电机主保护配置方案的定量化设计过程。
The quantitative design process of main protection configuration scheme for hydro-generators can be further simplified using the presented method.
相关设计思想将在奇数多分支大型水轮发电机主保护的设计中继续得以验证和完善。
The quantitative and optimum design will be verified and improved during its practices in large-sized hydro-generators with odd branches.
相关设计思想将在奇数多分支大型水轮发电机主保护的设计中继续得以验证和完善。
The quantitative and optimum design will be verified and improved during its practices in large-sized hydro-generators with odd branches.
应用推荐