三峡工程是世界上规模最大的水利枢纽工程之一,具有防洪、发电、航运等综合效益。
The Three Gorges Project which has considerable comprehensive benefits in the flood control, power generation and navigation is one of the greatest hydro-junction engineerings.
由于存在着峰谷电价差,发电量最大并不意味着效益最大。
Because of the price difference of peak and valley electricity, maximizing electricity is not equal to maximize benefits.
为争取成功地上网发电并取得最大经济效益,电厂需要研究优化的竞价策略,分析上网报价的电量-电价曲线模型。
So the bidding strategy should be studied to gain maximal profits and the power quantity-power price curve model of bidding should be analyzed.
该模型可以形成发电商的最优策略以最大化中长期生产效益和可以找到中长期市场平衡点并据此评估市场中长期运行情况。
The model can be used to define the optimal bidding strategy for each producer and, as well, to find the market equilibrium and assessing the market performances.
该模型可以形成发电商的最优策略以最大化中长期生产效益和可以找到中长期市场平衡点并据此评估市场中长期运行情况。
The model can be used to define the optimal bidding strategy for each producer and, as well, to find the market equilibrium and assessing the market performances.
应用推荐