• 节约淡水资源,压裂作业环保

    Conserves the freshwater supply for more environmentally – friendly fracturing;

    youdao

  • 水力压裂作业所使用主要流体

    The primary fluid used in hydraulic fracturing operations.

    youdao

  • 压裂作业期间注入地下

    Water that has been injected into the subsurface during a frac job.

    youdao

  • 油井压裂作业油井增产主要措施

    The fracturing of oil well is a main measure to improve the oil production.

    youdao

  • 被要求成功地进行水力压裂作业人员集合术语

    Collective term for the personnel required to run a successful hydraulic fracturing operation.

    youdao

  • 利用溶液压裂碳酸盐储层进行的水力压裂作业

    A hydraulic fracture job on a carbonate reservoir using an acid solution as the frac fluid.

    youdao

  • 油井地层压力温度测量水力压裂作业关键工艺之一。

    The survey of pressure and the temperature for oil well ground is the key technology when do operation on hydraulic fracture treatment.

    youdao

  • 最终压裂作业程序处理参数根据测试压裂处理的结果进行改善。

    The final job procedures and treatment parameters are refined according to the results of the minifrac treatment.

    youdao

  • 压裂作业最后,沿向下洁净替置清理井内的支撑剂。

    At the end of the farc job, a clear fluid flush is pumped down the well to clean the well of proppants.

    youdao

  • 除去清洗反排支撑时间13内我们完成12压裂作业

    The 12 fractures were completed with-in 13 days, excluding the time it took for an early fishing and proppant cleanout operation.

    youdao

  • 不足可以设计容量10%或者更少,这取决于压裂作业把握度

    Under-displacement may be designed at 10% of this volume or less, depending on confidence.

    youdao

  • 对于渗复杂层多层油气藏期望一次性所有产层减少压裂作业次数

    For thin multilayer reservoirs with low permeability, it is expected to conduct fracturing in all pay zones at one time to reduce the frequency of fracturing operation.

    youdao

  • 水力压裂作业期间暂时封堵渗透地层使压裂进入渗透地层所用物质

    Material that is used to plug temporarily the highly permeable zones and direct the frac fluid to the less permeable zone during hydraulic fracturing.

    youdao

  • 压裂作业期间装在器上装置压裂支撑压力压裂沿向下流动。

    The device that is attached to the blowout preventers during a frac job. Fluid and propping agent are pumped under pressure into the frac head and down the well.

    youdao

  • 一方面,大型加砂压裂作业有效有机地匹配优化层、压裂液和工艺系统地控制压裂质量。

    On the other hand, the effective large-scale sand fracturing requires optimum reservoir formation, fracturing fluid and techniques, and systematic control of the fracturing quality.

    youdao

  • 压裂泵柱塞密封性能好坏使用寿命长短直接影响压裂酸化作业的正常实施,密封不良带来很大的维护工作量

    Sealing performance and operating life of the fracturing pump directly influence quality of the acidizing operation, and bad seal will result in great deal of maintenance work.

    youdao

  • 酸化压裂协同作业工艺技术,近年来针对渗透等复杂油气藏开展热门技术

    Aeidization and sand fracturing cooperation operation technology is a hot spot of new technologies developed for complicated hydrocarbon reservoir with low permeability.

    youdao

  • 时泵注技术种新兴的泵注技术,国内外加压裂酸化施工作业发挥重要作用。

    The newly developed precise pumping technique has been effectively used in sand fracturing and acidizing operation around the world.

    youdao

  • 由于施工井口压力常规压裂工艺无法实施作业

    For high well head pressure, the operation of conventional adding sand fracture treatment tech can not fulfilled.

    youdao

  • 重复压裂过程中裂缝扩展动态监测保障作业能否成功关键

    During the refracturing process, monitoring fracture propagation is important to ensure the success of the job.

    youdao

  • 为了减轻油气井压裂地层污染降低作业成本,研制了高强度压裂专用悬挂

    To reduce the pollution of the oil-gas well towards the bottom after its fracturing and decrease the operation costs, the hanger specially used for annulus feeding fracturing was developed.

    youdao

  • 没有进行增产处理作业压裂酸化)的完

    A well completion with no stimulation such as fracing or acidizing.

    youdao

  • 技术依靠降解材料,使用可降解压裂球座,而非传统隔离储层,避免磨铣塞等作业

    This new innovative method relies on material dissolution to avoid the need to mill out plugs. During fracturing, the new method follows the isolation process of the plug and Perforate technique.

    youdao

  • 主要水力压裂处理以前所进行小型压裂处理。其目的在于获取作业设计实施关键数据和确认处理层段的预计反应

    A small fracturing treatment performed before the main hydraulic fracturing treatment to acquire critical job design and execution data and confirm the predicted response of the treatment interval.

    youdao

  • 由于工作条件相当恶劣,压裂易损件——的使用寿命相当低,甚至于不足以完成一次作业(2.5小时)。

    Under the severe operating conditions, the life of its quick-wear parts, valves, is too short to accomplish one run (about 2.5 hours).

    youdao

  • 完成充挤压充填作业之后上提服务工具一次性关闭本层留井管柱上监测压裂滑套。

    Upon completion of the treatment, the service tool was repositioned to close the monitoring sleeve and the frac sleeve in one upward movement.

    youdao

  • 最近,新型压裂应用触角延伸至射孔完井作业中。

    More recently, dissolving balls have been deployed with bridge plugs for plug and perf completions.

    youdao

  • 最近,新型压裂应用触角延伸至射孔完井作业中。

    More recently, dissolving balls have been deployed with bridge plugs for plug and perf completions.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定