在汽机DEH系统适应快速降负荷的情况后,根据汽机主设备要求的时间短暂带厂用电负荷运行进行滑压停机。
The turbine DEH system adapts to prompt load drop, when the unit runs with transient house load to realize sliding pressure shutdown following the time required by turbine main equipment.
在全厂停电时不能从厂外取得可靠厂用电源时,应装设备用汽动给水泵。
When the entire factory power break down and cannot obtain the reliable power for the factory use from outside, there is a need to install the spare steam water supply pump.
介绍了陈村水电站厂用电系统设备技术改造情况。
This paper introduces the reformation of the station-service power supply equipment at Chencun Hydropower Station.
通过对负荷的统计计算、短路电流的计算,进行了对厂用电源的引接方式、接线方案、电气设备的选择,以便发电厂厂用设备可以正常运行。
According to the calculation of load and short circuit, the manner of the electrical source and the project of liner and the choice of the electric equipment are be fixed on.
有些电气工程师设计和维护发电厂、输电线、以及各种家用和厂用电气设备。
Some electrical engineers design and maintain power plants, transmission lines and home and factory electrical installations.
有些电气工程师设计和维护发电厂、输电线、以及各种家用和厂用电气设备。
Some electrical engineers design and maintain power plants, transmission lines and home and factory electrical installations.
应用推荐