• 第二仓库设置根据工厂生产需要厂房设备条件统筹规划合理布局

    The second set of storage required under the Factories and production plant conditions overall planning, rational distribution;

    youdao

  • 工程费用开支可分成如下几部分:工资一千万英镑厂房设备四百万英镑。

    Expenditure on the project breaks down as follows: wages 10m, plant 4m, raw materials 5m.

    youdao

  • 制造厂必须安装支付投入使用厂房设备原材料,经过劳动生产,然后才能销售

    The manufacturer must assemble, pay for, and put to use plant, materials, and labor before he can produce a salable product.

    youdao

  • 此外,第二期厂房设备亦可处理氧化涂布金全镀金沉锡等表面处理工序。

    It is also equipped with tin spraying, anti - oxidizing coating, and gold, tin and silver emulsion processing capabilities. construction works are expected to complete in 12 months.

    youdao

  • 暂时反应堆停止操作以对厂房设备进行维护大修包括更换部份消耗铀燃料组件。

    Refuelling outage A temporary shutdown of the nuclear reactor unit for carrying out maintenance and overhaul of plant and equipment including the replacement of a portion of used fuel.

    youdao

  • 暂时反应堆停止操作以对厂房设备进行维护大修包括更换部份消耗铀燃料组件。

    Refuelling outage A temporary shutdown of the nuclear reactor unit for carrying out maintenance and overhaul of plant and equipment including the replacement of a portion of used fuel.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定